2024 Pavement Rehab Shared Use Path, CIP No. 8250
The work shall include, but not be limited to, mobilization and demobilization, public notification, traffic control, clearing, grubbing, environmental protection, potholing, adjusting and replacing utility boxes and covers, concrete improvements, removal of existing various paved shared use paths, grading, placing geogrid, aggregate base, and hot-mix asphalt (HMA) paving, and incidentals for various shared use paths.
Plans
(click to expand/collapse)
Name | Size | ||
Davis 2024 IFB Shared Use Path Plans 20240626 Compressed | 15.4 MB |