RFQ Prequalification Invitation for Sewer Lift Station No. 3 Rehabilitation, CIP No. 8275
The construction project will include the following improvements: Construction of a new lift station while existing lift station remains in operation; Construction of a new 4” force main across Denison Drive and East Covell Boulevard; Abandonment of the existing dry pit pump station; Abandonment or removal of pipes, electrical and other infrastructure; Demolition of the existing water well concrete pad and equipment; Installation of electrical panels and instrumentation; Installation of concrete and asphalt surfacing, fencing and site improvements.
Addendum 1
(click to expand/collapse)
Name | Size | |||
Addendum No. 1_Prequalification CIP 8275 Sewer Lift Station No. 3 | 205.7 KB |