2024 Pavement Rehabilitation Project - Colusa Ave & Juniper Ave Rehab Package, CIP No. ET8250
The work shall include, but not be limited to, mobilization and demobilization, public notification, traffic control, stage construction, clearing, grubbing, environmental protection, potholing, adjusting and replacing utility boxes and covers, concrete improvements (e.g., curb and gutter, sidewalk and ADA/PROWAG compliant curb ramps), removing asphalt concrete (AC) surfacing and base materials, subgrade preparation and compaction, grading, full-depth hot-mix asphalt (HMA) paving, conventional road reconstruction with aggregate base, geogrid, and HMA, traffic striping, markings, and markers, and incidentals for various streets.
Addendum 1
(click to expand/collapse)
Name | Size | |||
Addendum 1 CIP 8250 Colusa and Juniper | 233.8 KB |