2022 Traffic Signal Improvements Project, CIP No. ET8279
The work shall include In general, the work shall include mobilization, public notification, traffic control; hot-mix asphalt (HMA) patches and base repairs; concrete improvements, including curb ramp replacements for ADA compliance, sidewalk and curb and gutter repairs; bike and pedestrian path reconstruction requiring removal of asphalt concrete pavement and underlying subgrade materials; etc.
Plans
(click to expand/collapse)

Name | Size | ||
FInal Submittal Plans 20240528 | 9.8 MB |